27-Feb-2025 |

 

News

VP.Start Conducts Pre-Commissioning Installation of DRC-015 and LMS for EDC

On February 20, 2025, VP.Start’s engineers conducted a pre-commissioning for the complete installation of DRC-015 and deployed the Low Voltage Management System (LMS) in collaboration with EDC engineers in Phnom Penh. DRC-015 is designed to transform Low Voltage Distribution Board (LVDB) into digitally operated systems, enhancing efficiency and reliability. This smart grid IoT device is capable of collecting a wide range of real-time data from LVDB, eliminating the need for operators to manually inspect equipment on-site anymore.

The data collected from LVDB by DRC-015 is transmitted to the Low Voltage Management System (LMS), which streamlines operations and improves cost efficiency. Additionally, LMS provides instant alarm notifications for overcurrent and overtemperature conditions in LVDB and transformers, enabling operators to promptly analyze issues, reduce energy losses, and prevent potential fire hazards.

OTHER News